AI and energy infrastructure, explained plainly.

The numbers that matter

The physical figures this journal keeps coming back to, layer by layer. Power, distance, time and capacity, never a share price. Each one is dated and links to the piece that explains it and names its source.

The grid connection

3.8 GW

Data centre load in Dominion Energy's zone that switched to backup generation after a normally cleared fault on 22 July 2026, the largest load transfer in PJM's history.

As of 22 July 2026 America rations the plug: who may be cut, who must hold on, who pays

Earlier worded as demand that vanished in under a second; PJM times the transfer to the minute, in two stages.

Power on site

53%

Share of planned 2026 American utility-scale battery additions sited in Texas, 12.9 of 24 gigawatts. Storage is following the computing load.

As of February 2026 America rations the plug: who may be cut, who must hold on, who pays

Counts planned grid-scale battery additions, which also trade; no one publishes the share sited at data centres.

Power inside the building

Cooling

The network between chips

Memory

Chips and the factories that make them

70 → 120 mm

Ajinomoto's estimate of how the base of an advanced chip package grows: about 70 millimetres square with nine wiring layers up to 2023, about 100 with eleven in 2026, about 120 with thirteen from 2031. Each layer needs its own sheet of insulating film.

As of May 2026 The chip supply chain's slow parts are sold years before they are made

Who runs the capacity

Each figure is as the linked piece cites it, and the sources sit at the foot of that piece. When a figure is overtaken it is updated here with a note, and the piece carries an update line. Spotted a figure that has moved? Tell me. Personal research, not investment advice.