AI and energy infrastructure, explained plainly.

Companies

Google

On the map: Power on site · The grid connection · The network between chips · Cooling

Named in 4 pieces. Each entry below is that piece's own description of what the company makes, from its exposure map.

  1. The buyers

    Microsoft, Google and Meta run AI data centres on long nuclear contracts.

    Nuclear power for AI comes from old reactors first. The new ones wait on fuel. · 29 September 2026

  2. Protection and slower chips

    Schneider Electric, Eaton and Vertiv make switchgear and backup power. Emerald AI makes software that slows AI work for Google and others.

    America rations the plug: who may be cut, who must hold on, who pays · 22 September 2026

  3. Glass and mirrors

    Corning, Prysmian and Fujikura make fibre. Google and Lumentum make optical circuit switches. Ciena links distant sites.

    How ten thousand chips talk: the glass stays, and the plug survives its replacement · 4 September 2026

  4. The halls that choose

    Microsoft, Google, Meta, Amazon and Jane Street run data centres, filled with chips Nvidia and AMD design.

    Heat and water decide where AI goes: liquid to the chip, a choice on the roof · 21 August 2026

This maps who operates in each layer. It is not a recommendation, and naming a company is not a view on its shares. Personal research, not investment advice.